Saginaw River Basement Waterproofing Call (989) 812-2645

Thomas Township, between the river and the drain

Basement waterproofing in Thomas Township starts at the township office, 249 N. Miller Road, where a building permit must be issued before any work begins. Half the homes here were built from 1950 to 1979, and the township floodplain manager on 989-781-0150 is worth a call first if your lot lies low.

A plain clapboard house on a flat lot with standing meltwater across the lawn and driveway in late winter.
Flat ground and slow drains: the spring picture across much of western Saginaw County.

Thomas Township covers about 31 square miles of land on the west side of Saginaw County, with its centre roughly 8.2 miles from downtown Saginaw in a straight line. It is a suburb of almost 12,000 people with farmland at its western edge, and the Tittabawassee River runs along its northern side. The 2020 Census counted 11,931 residents and the 2025 estimate is 11,900, so the population has been steady.

What the houses are

The Census estimates 5,444 housing units here, with a median year built of 1978. That is newer than Saginaw or Bay City and close to the regional middle. The 1970s were the busiest decade by far, with 1,391 homes, a quarter of the stock, and 55.2 percent of all homes went up before 1980. Another 1,030, about 18.9 percent, date from 2000 or later. Most homes, 75.5 percent, are single detached houses, and 346, about 6.4 percent, are mobile homes, which have no basement to waterproof. Owners occupy 87.0 percent of occupied homes, and the median owner occupied value is 191,900 dollars.

A 1970s basement is usually poured concrete or block with a footing drain to a sump, which is a more forgiving starting point than the clay tile and combined sewers of the older cities. The common failures here are pumps that have run for decades, pits too small for the spring, and settlement cracks in poured walls. Our crack repair page explains how to tell a shrinkage crack from one that is still moving.

The permit comes first

The township's guidance, read through a search summary, is plain: a building permit must be obtained at the Thomas Township office before any work begins. The office is at 249 N. Miller Road, on 989-781-0150, with the building inspector on extension 201. Electrical and plumbing work have their own inspectors and their own applications. Where a job disturbs soil outside, the township points to Saginaw County Public Works for soil erosion permits, on 989-790-5258. New building also goes through a stormwater drainage plan review under township Ordinance 09 G, which matters if exterior work changes how water leaves the lot.

May 2020 and the floodplain

On 19 May 2020 the Edenville and Sanford dams upstream failed, and the Tittabawassee River flooded downstream through Midland and Saginaw counties. The township published a special flood edition of its newsletter and set up a self report process for damage. It takes part in the National Flood Insurance Program, which means flood insurance is available to every resident, and it asks anyone planning work in a mapped floodplain to speak to its floodplain manager on the main office number first. A basement that took river water is a flood question, not a drainage contract, and the order of calls matters.

Swan Creek and the farm drains

South of the river, much of the township drains through county drains rather than streams. The largest is the Swan Creek Intercounty Drain, an 18.5 mile open channel serving about 140 square miles and more than 8,000 parcels in Saginaw, Midland and Gratiot counties. Thomas Township petitioned in 2017 to consolidate it with the Jo Drain, and construction began in January 2019, including clearing log jams that had slowed the channel. When those drains run full in spring, the water table under nearby lots rises with them, and a sump that is quiet in August can cycle constantly in April. On that kind of ground, a sized pit and a reliable interior drain do most of the work. Typical prices are on the cost page.

Nearby

Saginaw Charter Township, immediately east, publishes a flat permit fee formula and runs its own floodplain desk, so a few hundred yards can change both the paperwork and the price.

Questions people ask

Do I need a permit for basement waterproofing in Thomas Township?
Plan on one. The township says a building permit must be obtained at its office, 249 N. Miller Road, before any work begins. Call 989-781-0150 and ask which permits cover your plan; electrical and plumbing work have separate applications.
My basement flooded in May 2020. Is that a waterproofing problem?
Probably not on its own. Water from the Tittabawassee River after the dam failures is flooding, which drainage work does not stop. Talk to the township floodplain manager on 989-781-0150 about your lot and flood insurance before paying for a drainage system.
Why does my sump run so much in spring?
Much of the township drains slowly through county drains such as Swan Creek. When those run full, groundwater under nearby lots rises and the sump pumps more. A pit that is too small or a tired pump shows up first in March and April.
Who issues soil erosion permits for outside digging here?
Saginaw County Public Works, on 989-790-5258, according to the township's guidance. Exterior excavation that disturbs enough ground needs that permit as well as the township building permit.

Where these numbers come from

Last checked 11 November 2026.

Describe the water and get a call back

Tell us what you are seeing and where. One independent company that works your township picks it up.

Call (989) 812-2645